Foam Rope – Structural Glazing Tape – 9mm Thick (7.5m Rolls)
£18.70 incl. VAT
A double sided, high tack PVC structural spacer glazing tape. Designed for use in structural spacer systems.
With an open cell structure to allow the curing of structural silicones on all sides. Coated in acrylic adhesive. Fast recovery from compression.
Tested to ASTM E96-2005 water vapour transmission to determine open cell airflow structure. Tested and Approved by The Dow Chemical Company.
Sold By Manufacturer
DESCRIPTION
Double Sided high tack acrylic adhesive coated PVC structural spacer glazing tape. This tape is designed for use in structural spacer systems and has an open cell structure to allow the curing of structural silicones on all sides. Fast recovery from compression.
COLOUR
Black / Grey (by special order)
Tested to ASTM E96-2005 water vapour transmission to determine open cell airflow structure
GENERAL CHARACTERISTICS | VALUE | STANDARD |
Density | 300 kg/m³ | — |
Tensile Strength | 500 kpa min | DIN 53571 |
Elongation | 150% min | DIN 53571 |
Tear Strength | 2.5 kg/cm min | DIN 53515 |
Compression Set | 10% max. | DIN 53572 |
Final Recovery | 90-98% | DIN 53572 |
Force to compress by 5% (to retain air permeability) 40N/CM²
Water Absorption 8% by volume
Cold Flexure -30°C pass 6 mm Madril
Temperature Resistance -50°C to +60°C BS 2571
Thermal conductivity 0.19w/(m. K) or 0.16 kcal
Shore Hardness | 75-85 | Shore 00 , 35 Shore A |
Resistance to Ageing | Excellent | |
Resistance to Chemicals: – | ||
Acid | Good | |
Mineral Oil | Good | |
Alcohol | Good | |
Alkalis | Good | |
Petrol | Good | |
Soap & Detergents | Good | |
Compression required to achieve a | ||
Positive waterseal | 10% |
ADHESIVE SPECIFICATION
CONSTRUCTION |
:
TYPE |
OPEN FACE | |
Adhesive Pure high tack Acrylic 70 gsm | |||
TEST
Adhesive strength |
1 minute | 21N/25mm | |
(FINAT TM 1-adhesion | 20 minutes | 23N/25mm | |
of polyester 50 um against stainless steel | 24 hours | 25N/25mm | |
1 kg Static Shear, 25 mm x 25 mm 33 hrs
Release 15 N/m
Temperature Range -20°C to +90°C
ADHESIVE SPECIFICATION : CLOSED FACE
CONSTRUCTION TYPE
Adhesive Pure high tack Acrylic 50 gsm
TECHNICAL DATA
Carrier : None
Release Liner : Filmic Liner: 150 mic at sizes up to 8mm, 80 mic at 9.5mm and 12mm
Adhesive : Pure acrylic
Adhesive strength 1 minute 14N/25mm
(FINAT TM 1-adhesion 20 minutes 16N/25mm
of polyester 50 um against 24 hours 21 N/ 25mm stainless steel)
Resistance to chemicals When correctly applied, resistant against most
solvents, mineral oils, fuels, aliphatic solvents, dilute acids, salts and alkalis.
Application temperature >15°C
Shelf life 1 year
(at 20°C and 50% relative humidity)
Flammability
This product is made up from PVC foam coated on both sides with an adhesive. It has not been tested for flammability but can be considered self- extinguishing due to the nature of the components. However, it should be noted that any smoke created would be highly toxic and would emit Hydrogen Cyanide gas during and after burning.
NOTE
All Technical data is based on average values. By nature of its manufacture, all foam specifications can vary by 10%. Statements, technical information and recommendations contained herein are based on tests we believe to be reliable. The user shall determine the suitability of the product for his/her intended use and the User assumes all risk and liability whatsoever in connection herewith.
Products are manufactured to rigid standards of quality.
To date no known failures have occurred due to the premature ageing of this product.
All our shipping is Free of charge on orders over £400 within the London (M25) Area.
All standard sizes Flat & Pitched Skylights are delivered between 3 to 6 working days.
All Custom Size orders take 3 to 6 weeks to be produced and shipped over to the UK. They are free of delivery fees.
Roof Lanterns delivery is within 10-14 working days from the day the order was placed.
Framed Skylights delivery is within 10-14 working days from the day the order was placed.
Electric Opening Skylights delivery is within 10-14 working days from the day the order was placed.
Walk-On Skylights delivery is within 10-14 working days from the day the order was placed.
Skylight Blinds delivery is within 10-14 working days from the day the order was placed.
Monday to Friday from 8 am until 5 pm.
We will contact you to arrange a suitable delivery time, once payment has been processed.
Please add to cart the products you want and enter the shipping address to view delivery cost.
Our own drivers deliver within London (M25) in order to guarantee the safe arrival of all our products.
Please be aware that as our drivers are alone and pre-loaded in our warehouse, we will require you or your builders to be on-site for the acceptance of all orders.
For orders outside M25, we use an external shipping network. Once sent, they will call you to book a suitable date and time for delivery.
The Extra Economy Shipping options work for all areas, except Northern Ireland and Scotland.
Some of these companies may not have the correct vans in place and might not be able to deliver to your door, so we might have to ask you to pick it up from the local depot (usually within 20 min drive) however this is rare.
Most of our products weigh a considerable amount varying from 10kg to 280kg, therefore it may need more than two, four, or even six people to unload depending on the size and weight of your product.
We will not accept liability for any broken skylights during the unloading process, as it is down to the customer to organise this process.
In the event that the customer does not attend the delivery appointment or no one is there to accept your product, we will try and contact you via phone, text, and voicemail before our driver leaves your delivery address.
If no contact is made, we will have no option but to return your product to our warehouse.
Skylight Windows
Installation Guides

Say goodbye to complicated installations!
Our skylight installation guide provides clear and concise instructions to help you easily install our range of roof windows. From flat roof windows to pitched roof windows, our guides guide you step-by-step through the process, ensuring a hassle-free installation.
Structural opening – provided By builder
Bear in mind our Skylights sizes are the sizes of the bottom (internal) glass panel. The top panel is stepped by 100mm on each side, and the overall externally visible size is 200mm bigger in both directions:
For example, only in this guide will we present installation sketches for a Skylight 600mm x 600 mm. For all other sizes, we provide installation sketches in the gallery of each size separately.

Double/Triple Glazed Skylight 600x600mm has the following sizes:
The upstand should protrude a minimum of 150mm above the roof level
A minimum pitch of 8-10 degrees relative to the horizon must be provided to avoid water pooling in the middle of the glass panel (for every metre of Skylight a 10cm fall is required). It is worth spending a few extra minutes before applying the silicone to run a water test to ensure the water is not pooling (even though you are installing glass it will still bend in the middle). The internal distance upstand to upstand needs to be 10mm bigger than the quoted skylight size (in our example: 610mm by 610mm).

Upstand opening should allow for 5mm tolerance on each side:
Skylight Support – provided By builder
Install the support in such a way that the top of support is as follows:
-Triple Glazed Skylight – 46mm below the top of upstand
The Skylight support is a 25x50mm (2”x1” ) timber:

Weather the upstand
Apply the roof covering material to cover the external face and top of the upstand.
Make sure all surfaces where the silicone will be applied are clean of dirt, dust, moisture, etc.
- Apply the foam rope on top of the 2”x1” timber support to level off any discrepancies which will prevent any pressure and stop cracking on the bottom glass laminated pane. THE WARRANTY WILL BE VOID IF A FOAM ROPE IS NOT USED.
- Apply, generously, on top of the upstand weatherproof sealant, usually, 1 tube is enough for 6 linear metres.
- Lower the skylight with suction cups, and make sure you check the load on each cup.
- Apply waterproof sealant on the underside of the overhang and smooth it over once more to make sure it is watertight.
Once you finish weathering the upstand, you are ready to install the Skylight.

Video Presentation
Installation Guides

Installation
Accessories
Easily complete your skylight installation with our range of high-quality skylight installation accessories.
Frequently Asked Questions
We offer a 20 year seal warranty on all our skylights.
Tristique parturient nulla ullamcorper at ullamcorper non orci iaculis neque augue.
Our warranty is CE certified and meets European standards. As long as you install your skylight unit as per our instructions, the warranty is valid for twenty years. This covers you for any defects or damages, and we offer an aftercare service.
All our Skylight prices are on our product page. Discounts may be given if an order is above £2/5000 given as a trade price. Please contact our Customer Support Team for more information if you wish to make a large order so we are able to give you a discount code.
Yes, you can! Once you have placed and paid for your order, please get in touch with our Customer Support Team who will arrange someone to prepare your order for collection.
Yes, you can, if you go through to checkout, it will work out the delivery costs and options without placing an order.
No, we do not install. We only supply the skylights. We recommend looking for a reputable roofer within your area who can carry out the installation professionally.
Yes, we offer fixed and openable skylights.
The maximum value our skylights has is 0.9 W/m²K
Yes, you can have them installed once your skylight is fitted! As the installation of blinds behind the glazing increases the risk of Thermal Stress Glass Breakage, we advise you to install the blinds at a minimum distance of 150 mm from the glass.
All our Skylights come triple-glazed which provides optimum sound insulation. This, in turn, would help minimise any rain noise. The more panes of glass, the better the noise resistance and the greater the distance between each glass, the better your sound insulation will be. All our skylights are designed with these factors in mind. We offer triple glazed skylights with 6mm toughened safety glass as standard and a generous 15mm gap between the panes and bottom. Panes are 8mm thick reducing noise to maximum.
Our skylights are manufactured in Europe.
Skylights1.co.uk guarantees in supplying top quality products at the Best Price, due to manufacturing and delivering everything in house.
Do these come as standard or do I need to order them separately? You will need foam rope, weather proofing silicone and flashing kits along side your skylight. We have all of these on our website so you can order everything you need from us so you are ready to go.
Yes, we offer express delivery to most postcodes. Please check this service on our website or give us a call.
We accept PayPal, Credit and/or Debit Cards (Stripe), Google Pay, Amazon Pay and Direct Bank Transfer. You will see these payment methods offered to you upon check out. Unfortunately, we only accept payment in advance.
It is important to have your skylight installed at a slight angle relative to the horizon to allow water to run off the glass and avoid pooling. We recommend setting the rooflight at an angle of 45°. It is worth it to spend a few extra minutes before applying the silicone to run a water test.
Lead time depends on the size of the unit and the exact location in the UK, please add the item to your card and your delivery postcode and you will see all delivery options to your location-keep in mind that you will not be charged at this stage.
Minimum 6, maximum 45 degrees.
The website is the only place to place an order, and we don't take orders over the phone- but we are always contactable to answer any questions at any point.
Yes, just let us know any instructions for delivery or delivery dates in the “notes” box during checkout.
You can order a tint for your skylight by selecting the option on our custom calculator, we offer a green or blue tinted option.
No, the skylights arrive ready to install (don’t forget to order your accessories separately so you can be ready to go).
Triple Glazed skylights tend to have a better U-Value and Noise Resistance. What this means is that a triple glazed skylight will have better noise reduction properties if you live in a noisy area. The lower U-Value benefit of them is that they have less heat loss. So if you plan on having a larger skylight or more than one skylight on your extension letting in more natural light we would recommend going for triple as it will save you on your energy bills and lose less heat.
Double Glazed Skylights tend to be lighter in weight and easier for installations however they are not as good on heat loss and noise reduction as triple.
Reviews
There are no reviews yet.